Teak Decking, MBBS,
and Sneak Peek at Mast

Here we see the teak deck arriving by truck in 53 foot long sections. Coating sub deck with epoxy.
Foremast opening. Bow with area for windlass.
Working out the details on the bowsprit base. How does this fit?
Ty rides the bowsprit while fitting it through the bulwork. The main saloon is all dolled up for its presentation during the Maine Boatbuilders Show.
Main cabin stairs. Grandma and Grandpa Sprague ensconced on UltraSuede.
Peel back the wrapping on this extra-long carbon straw to reveal something amazing: Only on close inspection can you tell this is not wood!