Varnishing the Trim

 
Drawers being varnished. The bowsprit with mike in the background. Mike is varnishing the fiddles for the shelves in the main cabin.
Varnishing going on in the paint shop. This is the surround for the life raft. Pre-varnished trim in production.
There is a varnished cabinet door on the air conditioning locker. Veneer not yet on the panel to the right. Veneer vacuumed bagged on. A/C locker door taken off. Pass through to galley visable.
Ty slides the varnished style over the stainless wire chase guard. Dr. Shew fitting a respirator. The subject reads out loud to make sure that the mask remains tight during talking.
Gluing up the rails and styles on the main cabin. (forward starboard bulkhead) This is the platform on the aft end of the galley. The rectangular hole in the front is where the circulating heater is located.
Oh my word! We have to fit 6 pumps, a radiator, the Edson Bilge hose, the AC wiring, fuel lines, and another water lift muffler?