 |
 |
| Drawers being varnished. |
The bowsprit with mike
in the background. Mike is varnishing the fiddles for the shelves
in the main cabin. |
 |
 |
| Varnishing going on in
the paint shop. This is the surround for the life raft. |
Pre-varnished trim in
production. |
 |
 |
| There is a varnished
cabinet door on the air conditioning locker. Veneer not yet on the
panel to the right. |
Veneer vacuumed bagged
on. A/C locker door taken off. Pass through to galley visable. |
 |
 |
| Ty slides the varnished
style over the stainless wire chase guard. |
Dr. Shew fitting a respirator.
The subject reads out loud to make sure that the mask remains tight
during talking. |
 |
 |
| Gluing up the rails and
styles on the main cabin. (forward starboard bulkhead) |
This is the platform
on the aft end of the galley. The rectangular hole in the front is
where the circulating heater is located. |
 |
| Oh my word! We have to
fit 6 pumps, a radiator, the Edson Bilge hose, the AC wiring, fuel
lines, and another water lift muffler? |