January, 2003

 
Refridgeration central. Pressure tested and ready! "Re-fer" and surounding area.
2 inch bilge pump through-hull goes in. Here begins the tunneling through the hull. Very Small Piece. A grub for the inside corner of two bulkheads where they meet the cabin sole
The jig for drilling the bolt holes for the whisker stay tang. Bulworks going on inside the bulworks. Two layers of 12 mm plywood sandwiched between two outside layers of 12 mm teak.
Paneling in the Starboard and Port cabins.
(You are looking at their aft bulkheads.)
1 Main cabin floor paneling.
Templates for the dodger.
2 3
Mast Collars, Crantz Iron, Sampson Post, and Forestay Tang. Fore mast step.