 |
 |
| Shows the insulation
in the deck and thelights and wires run. Plastic squares keep the
epoxy which is on the back side of the deck from sticking to the lights. |
First Day half way down
the deck with the first layer of plywood. |
 |
 |
| Mike Smith wiring the
deck. |
Main mast step Shows
engine box waste heat vent holes. The heat from the engine box is
blown up the maine mast. |
 |
 |
| Hammering the deck down. |
Dave Smith fastens in
a stanchion base. |
 |
 |
| AC wiring coming thru
the headliner. |
Shows the stanchion bases
and the stainless backing block. |