Interior Design Details
This separation between the forward cabins can be raised or lowered depending on your needs - privicy or space?

 
Steve is attaching the Celutex insulation foam to the stainless refrigeration boxes, This foam is more efficient than other foams but has the unfortunate propensity to absorb moisture. It therefor has to be carefully encapsulated in aluminum foil and later epoxy to keep the moist air away from it.
This is the form for the Ice Box lid. A panel completed in the focsle. It covers a wire run from under the bunk into the anchor locker. The run contains all of the electrical service for the winches etc.
This is the bulkhead aft of the galley Settee separating the quarter berth from the work space. We are beginning to apply the paneling . the grounding strap for the single side band a 3 ich copper ribbon will travel under the white panels.
The aft end of the robertson steering gear and the beginning of a luan mock up of the auto pilot bracket, which has to receive the aft bearing for the steering rack and pinion shaft . The plywood disk is representing the geared chain sprocket which is shown on the deck in the second picture.
The Battery box with the batteries installed. They are Rolls 2 volt cells which gives us 625 AH in two combined 24 volt banks.