 |
 |
| Steve is attaching the
Celutex insulation foam to the stainless refrigeration boxes, This
foam is more efficient than other foams but has the unfortunate propensity
to absorb moisture. It therefor has to be carefully encapsulated in
aluminum foil and later epoxy to keep the moist air away from it. |
 |
 |
| This is the form for
the Ice Box lid. |
A panel completed in
the focsle. It covers a wire run from under the bunk into the anchor
locker. The run contains all of the electrical service for the winches
etc. |
 |
 |
| This is the bulkhead
aft of the galley Settee separating the quarter berth from the work
space. We are beginning to apply the paneling . the grounding strap
for the single side band a 3 ich copper ribbon will travel under the
white panels. |
 |
 |
| The aft end of the robertson
steering gear and the beginning of a luan mock up of the auto pilot
bracket, which has to receive the aft bearing for the steering rack
and pinion shaft . The plywood disk is representing the geared chain
sprocket which is shown on the deck in the second picture. |
 |
| The Battery box with
the batteries installed. They are Rolls 2 volt cells which gives us
625 AH in two combined 24 volt banks. |