| Main Cabin, Kitchen,
and Forward Head. |
 |
 |
| Nida Core in place between
the frames just below the foremast chain plates. The gray smudge is
conduit for the Lightning ground that will attach to the Chain plate.
The next step is to glue the ceiling to the Scrim surface of the Nidacore
and nail it to the wedges placed on the frames. |
Detail showing how Nida
Core is cut out to give the stove gimboling room. |
 |
 |
| Rich Shew coping out
the Nida core so that there is enough room to fit the four 8-d batteries
under the main cabin settee. |
Installing a sheet of
Nida core in a frame bay. |
 |
 |
| Stainless floor frames
going in with 3 1/2 inch #24 monel fastenings. |
Rich Straightening out
the Nida Core cabin sole cut-out where we needed to increase the width
of the cabin sole in the Forward head. |